Brought in to replace 8 old metal Halide fittings with 8 new LEDs.
The old system consisted of 4 x 10 Towermaster Octolite columns. We were unable to lower the columns, due to bushes, trees, etc so the only option was a 20mt Spider lift.
Pricing against floodlighting contractors, Sports Lighting came out on top, and delivered a superb outcome.
The clients were well please with our quality and efficacy of our work. Left Torquay at 5.30am, arrived at the club at 12pm, completed the installation by 5.30pm the same day.
Need to say it again, Sports Lighting doing what we do best all the time.
Thank you so much to Betws Yn Rhos Bowling club for everything.