A low level lighting scheme. Shots across the arena. Calming lights so the horses won’t shy. Clients well pleased. All done by two of us in one day in extreme heat !!
1st stage of the ground work finished today. All cables run, column holes dug and poured concrete. Now wait time of approx 4 weeks for the concrete to cure before we erect the 6 x 15mt base hinged columns. Thank you to everyone at the club who turned up to give a helping hand.
Quality installation for a small 50m arena. Using 240w LED,s. Completed in the same day. Client well pleased. Another great installation by Sports Lighting
Another great installation by Sports Lighting. 6 x 8mt base hinged columns and 12 x 240w asymmetric LED’s, with digital push timer. Client was well pleased with the installation.
Nearly completed a full installation of 6 x 15mt base hinged columns and 18 x 2kw Philips floods. Another great installation by Sports Lighting. Thank you to the club for there hospitality. One if the best
New installation started at Liskeard FC. All cables run in the trenches, concrete pads done today. Now wait approx 4 weeks, then erect 6 x 15mt base hinged columns and 18 x Philips asymmetric floods to achieve approx 225 lx
When my son James is not working on our floodlighting installations nationwide, he is doing what he does best “Flyboarding”. Doing private and corporate events all over the country. I even get to go sometimes 😁😁